Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for,

  • Supply, commissioning, and integration of new RPU panels.
  • Modifications of existing RPU panels.
  • Relocating, decommissioning, and commissioning of various Instruments.
  • SCADA Programming upgrades.

List of Major Suppliers:

  • PLC: Proficy PLC
    SCADA: GE iFix
    SCADA Standards: City of Toronto


 

Background
To replace the current DAF process with centrifuges to thicken the WAS before transferring the sludge to the anaerobic digesters.

Project Scope

  • Demolitions of WHR, Incineration & Chlorination Bldg.
    New TWAS Facility Construction
    SITC of TWAS facility equipment
    Instrumentation, Control Panel and Programming.

Project Demand

  • Extensive coordination of work with Contractors, Engineers and Owners was needed to schedule and complete the project on time.

Reason for Win!!

  • Knowledge and in-house expertise of the City of Toronto  PCS SCADA Standard 
     
     
     

Slide 1
Get connected with us now!
Slide 1
Image is not available
A one-stop systems integration solution for a powerful whole.
Social
LinkedIn
Toronto
+1 905 930 1100
info@valley-int.com
12-3170 Ridgeway Dr.
Mississauga,ON
L5L 5R4
Vancouver
+1 604-909-2091
info@valley-int.com
15300 Croydon Dr,
Surrey, BC
V3Z 0Z5
Thunder Bay
+1 905 930 1100
info@valley-int.com
886 Alloy Pl,
Thunder Bay, ON
P7B 6E6