Town of Erin - Water Resource Recovery Facility

Town of Erin - Water Resource Recovery Facility

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • New PLC, Mixer, Heat Tracing and Communication Panels
    Process Instruments: DO Analyzer, Gas Detection System, Flowmeters, Pressure, Temperature and Level.
    PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
    FAT, SAT and training for Instrumentations and PLC's.

List of Major Suppliers:

  • PLC : Rockwell PLC
  • SCADA : GE iFIX Professional
  • OIT : FactoryTalk View ME
  • SCADA Standards : Valley’s own standards
  • INSTRUMENTS : By Valley as per approved list.             

 

Background
Construction of new Water Resource Recovery Facility (WRRF). The project involves the construction of the new treatment plant along with outfall and force main between the two.

Project Scope
New pumps, Grit equipment’s. Bar Screens, Aeration grid, Clarifiers.
Plant wide HVAC & Gas detection system
Electrical Scope: MCC's, VFD's, lighting panels and transformer. RPU and communication panels.
Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Experts from MEP & Instrumentation of WTP being new project.
Effective Project Management & execution.

Reason for Win!!
Listed as an approved System Integrator
Accurate budgeting & Value Engineering

Screenshot_2024-03-09_001220.jpg

Township of Springwater - Doran Neighborhood Water Treatment Plant and Sewage Pumping Station

Township of Springwater - Doran Neighborhood Water Treatment Plant and Sewage Pumping Station

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • New PLC, Effluent Fan, and Network Access closet Panels
  • Process Instruments: Analytical measurement including Chlorine, Iron, Ph, Manganese, Turbidity, Ammonia Analyzers, Flowmeters, Pressure, Temperature and Level.
  • PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
  • FAT, SAT and training for Instrumentations and PLC's.

List of Major Suppliers:

  • PLC : Rockwell ControlLogix PLC
  • SCADA : GE iFIX Professional
  • INSTRUMENTS: By Valley as per the approved list


 

Background
Construction of new water treatment plant ( WTP) and sewage pumping station (SPS).


Project Scope
New pumps, Media Filter Tanks, reservoir cells, clean water trenches, dechlorination chambers
Plant-wide HVAC
Electrical Scope: MCCs, VFDs, lighting panels and transformers. PLC and communication panels.
Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Effective Project Management & execution.


Reason for Win!!
 Listed as an approved System Integrator.
• Comprehensive services, ranging from PLC, HMI, and SCADA programming to integration, & commissioning.
• Proven track record & unwavering commitment to quality through FAT & SAT processes.

City of Toronto - Ashbridge’s Bay Treatment Plant - WAS Thickening and South Substation Upgrades

City of Toronto - Ashbridge’s Bay Treatment Plant - WAS Thickening and South Substation Upgrades

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for,

  • Supply, commissioning, and integration of new RPU panels.
  • Modifications of existing RPU panels.
  • Relocating, decommissioning, and commissioning of various Instruments.
  • SCADA Programming upgrades.

List of Major Suppliers:

  • PLC: Proficy PLC
    SCADA: GE iFix
    SCADA Standards: City of Toronto


 

Background
To replace the current DAF process with centrifuges to thicken the WAS before transferring the sludge to the anaerobic digesters.

Project Scope

  • Demolitions of WHR, Incineration & Chlorination Bldg.
    New TWAS Facility Construction
    SITC of TWAS facility equipment
    Instrumentation, Control Panel and Programming.

Project Demand

  • Extensive coordination of work with Contractors, Engineers and Owners was needed to schedule and complete the project on time.

Reason for Win!!

  • Knowledge and in-house expertise of the City of Toronto  PCS SCADA Standard 
     
     
     

Region of Durham - Digester Complex Upgrades and Refurbishments project for The Duffin Creek Water Pollution Control Plant

Region of Durham - Digester Complex Upgrades and Refurbishments project for The Duffin Creek Water Pollution Control Plant

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for,

  • Supply, commissioning, and training of Gas Detection system & various flowmeters and Pressure Instruments.
  • Verification of existing PLC panels that requires modifications.
  • Supply and commissioning of Control devices, Control panels and PLC.
  • FAT and SAT of supplied PLC Panels

List of Major Suppliers:

  • PLC: Emerson Rx3i
  • SCADA: Existing
  • INSTRUMENTS: By Valley as per approved list


 

Background

Replacement & Upgradation of existing equipment’s in Digester complexes and Imported Sludge Receiving Station to meet specified operational performance.

Project Scope

Replacement of Mixers to linear motion technology.
Process Mechanical and Electrical upgrades.
Replacement of Waste Gas Burners.
Plant Instrumentation and Control programming.

Project Demand
Gas Detection System handling experience.
Modification, Verification, and coordination between contractors.


Reason for Win!!
 Holistic Solutions: Offering end-to-end services for Instruments & Control Panels.
 Showcased proficiency in PLC panel modifications, verifications & programming.
 Effective Project management to ensure seamless supply, commissioning & integration.

 

City of Hamilton – Garner Road (HD018) Water Pumping Station Upgrades

City of Hamilton – Garner Road (HD018) Water Pumping Station Upgrades

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • Instrumentation system that monitors and controls process parameters including flowmeters, pressure transmitters, chlorine analyzers, ammonia analyzers and level instruments
  • Supply, test and commissioning of Local control panels (LCP) and PAC panels.
  • Modification of existing PAC panel

List of Major Suppliers:

  • PLC : Rockwell ControlLogix PLC
  • OIT : QuickPanel+
  • INSTRUMENTS : By Valley as per approved list.


 

Background
Providing new Pumps and replacing existing ones & bypass System to increase the capacity of existing pumping station.


Project Scope
Removal and replacement of HLP01 and HLP04
New suction header and suction piping
Replacement of actuators on the discharge side
New two standalone VFD panels with bypass capability for pimps
New PLC panel and PAC panel.
Instrumentation, and Control Panel

Project Demand
Supply of instrumentation and control panels as per City of Hamilton Standards


Reason for Win!!
Knowledge in end user standards.
Showcased expertise in retrofitting projects coupled with adept project management.

Screenshot_2024-03-08_234859.jpg

Regional Municipality of Niagara -Line 2 Sewage Pumping Station Upgrade

Regional Municipality of Niagara -Line 2 Sewage Pumping Station Upgrade

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • Supply, commissioning, and training of plant instruments including primary elements, transmitters.
  • PLC system hardware, standard programming, and application software.
  • 24/7 Remote monitoring and control system of Pumping station and Remote monitoring facility devices.

List of Major Suppliers:

  • PLC : Rockwell PLC, CompactLogix
  • OIT : Emerson Quick Panel+
  • SCADA : Existing
  • INSTRUMENTS : By Valley as per approved list.


 

Background
Wet well & Valve Chamber improvements, including replacement of pump guide and lifting systems.


Project Scope

Replacement of Pumps, Level devices and Check Valves.
Supply & installation of a new metering chamber
Control room upgrades, Replacement of PLC & associated upgrades.
24/7 Remote Monitoring and Control systems.

Project Demand

Detailed site analysis to perform upgrades.
Remote monitoring and control system in the remote treatment facility.


Reason for Win!!
Proven capability in delivering PLC system hardware, standard programming, & application software solutions.
• Comprehensive expertise in supplying, Testing, commissioning & training for a wide array of plant instruments.

Town of Erin - Erin Wastewater System Sewage Pumping Station

Town of Erin - Erin Wastewater System Sewage Pumping Station

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • New PLC and Communication Panel
  • Process Instruments: Flowmeters, Pressure, Temperature, Level and smoke detectors.
  • Process Control Narrative Development
  • PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
  • FAT, SAT and training for RPU's and PLC's.

List of Major Suppliers:

  • PLC : Rockwell ControlLogix PLC
  • SCADA : GE iFIX Professional
  • OIT : FactoryTalk View ME
  • SCADA Standards: Valley’s own Standards             


 

Background
Construction of a new Sewage Pumping Station (SPS) as part of a new Erin Wastewater Collection System extending from the communities of Hillsburgh and Erin Village.


Project Scope
New pumps, associated process piping, pipe supports, guide rails, and valves.
Building mechanical services including heating and ventilation, fire protection, water services
New 600V 3 Phase service with meter, transformers at SPS and diesel standby generator at       William Street site
Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Effective Project Management & execution.


Reason for Win!!
•  A one-stop systems integration solution for a powerful whole.

 
 

Screenshot_2024-03-09_000625.jpg

Township of Stirling - Rawdon - George Street Pumping Station Upgrades

Township of Stirling - Rawdon - George Street Pumping Station Upgrades

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • Modification & Integration services on existing PLC for new IO’s.
  • New PLC & Instruments for to monitor & control process parameters
  • Process Control Narrative Development
  • PLC & SCADA Programming, Testing, Integration, Commissioning and Documentation.

List of Major Suppliers:

  • PLC : Rockwell PLC
  • OIT : Rockwell PanelView



 

Background
Replacement & upgrade of infrastructure equipment which involves sewage transfer to the Town’s Lagoon wastewater treatment system.


Project Scope
Replacement of Pumps, Motors, Electrical & HVAC equipment.
New Sewage Pumps
Modification in Electrical and upgradation of HVAC system.
PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Integration Services of new controls to existing.
Site coordination, faster delivery and on-time executions.


Reason for Win!!
Expertise in seamless integration and modification of existing PLC systems.
• Expertly deploying PLC and instrumentation solutions for process monitoring and control

Screenshot_2024-03-09_001650.jpg

Region of Durham - Harbour Street Sanitary Sewage Pumping Station (SSPS) pump and MCC replacement

Region of Durham - Harbour Street Sanitary Sewage Pumping Station (SSPS) pump and MCC replacement

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • Instrumentation system that monitors and controls process parameters
  • Development of PCN from draft process narrative.
  • PLC & SCADA programming.
  • Integration of the pumping station control system with Region's SCADA network.

List of Major Suppliers:

  • PLC : GE Rx3i
  • SCADA : Existing
  • INSTRUMENTS : By Valley as per approved list.



 

Background

Providing new Pumps & bypass System and backup control panel.

Project Scope
New RPU panel and HMI Screen.
Instrumentation, Control Panel, and programming for associated instruments.
Providing a SCADA communication system to connect Harbour SSPS into the Region SCADA general network.

Project Demand
Modification of existing PLC programming.
Integration with Region’s network.


Reason for Win!!
 Comprehensive solution delivery: New RPU panels, HMI screens, and instrumentation.

 Demonstrated success in seamless integration pertaining to SCADA communication projects.

Slide 1
Get connected with us now!
Slide 1
Image is not available
A one-stop systems integration solution for a powerful whole.
Social
LinkedIn
Toronto
+1 905 930 1100
info@valley-int.com
12-3170 Ridgeway Dr.
Mississauga,ON
L5L 5R4
Vancouver
+1 604-909-2091
info@valley-int.com
15300 Croydon Dr,
Surrey, BC
V3Z 0Z5
Thunder Bay
+1 905 930 1100
info@valley-int.com
886 Alloy Pl,
Thunder Bay, ON
P7B 6E6