City of Hamilton – Garner Road (HD018) Water Pumping Station Upgrades

City of Hamilton – Garner Road (HD018) Water Pumping Station Upgrades

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • Instrumentation system that monitors and controls process parameters including flowmeters, pressure transmitters, chlorine analyzers, ammonia analyzers and level instruments
  • Supply, test and commissioning of Local control panels (LCP) and PAC panels.
  • Modification of existing PAC panel

List of Major Suppliers:

  • PLC : Rockwell ControlLogix PLC
  • OIT : QuickPanel+
  • INSTRUMENTS : By Valley as per approved list.


 

Background
Providing new Pumps and replacing existing ones & bypass System to increase the capacity of existing pumping station.


Project Scope
Removal and replacement of HLP01 and HLP04
New suction header and suction piping
Replacement of actuators on the discharge side
New two standalone VFD panels with bypass capability for pimps
New PLC panel and PAC panel.
Instrumentation, and Control Panel

Project Demand
Supply of instrumentation and control panels as per City of Hamilton Standards


Reason for Win!!
Knowledge in end user standards.
Showcased expertise in retrofitting projects coupled with adept project management.

Screenshot_2024-03-08_234859.jpg

Slide 1
Get connected with us now!
Slide 1
Image is not available
A one-stop systems integration solution for a powerful whole.
Social
LinkedIn
Toronto
+1 905 930 1100
info@valley-int.com
12-3170 Ridgeway Dr.
Mississauga,ON
L5L 5R4
Vancouver
+1 604-909-2091
info@valley-int.com
15300 Croydon Dr,
Surrey, BC
V3Z 0Z5
Thunder Bay
+1 905 930 1100
info@valley-int.com
886 Alloy Pl,
Thunder Bay, ON
P7B 6E6