Town of Erin - Erin Wastewater System Sewage Pumping Station

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • New PLC and Communication Panel
  • Process Instruments: Flowmeters, Pressure, Temperature, Level and smoke detectors.
  • Process Control Narrative Development
  • PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
  • FAT, SAT and training for RPU's and PLC's.

List of Major Suppliers:

  • PLC : Rockwell ControlLogix PLC
  • SCADA : GE iFIX Professional
  • OIT : FactoryTalk View ME
  • SCADA Standards: Valley’s own Standards             


 

Background
Construction of a new Sewage Pumping Station (SPS) as part of a new Erin Wastewater Collection System extending from the communities of Hillsburgh and Erin Village.


Project Scope
New pumps, associated process piping, pipe supports, guide rails, and valves.
Building mechanical services including heating and ventilation, fire protection, water services
New 600V 3 Phase service with meter, transformers at SPS and diesel standby generator at       William Street site
Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Effective Project Management & execution.


Reason for Win!!
•  A one-stop systems integration solution for a powerful whole.

 
 