Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming
Valley Integration was responsible for SITC of,
- New PLC and Communication Panel
- Process Instruments: Flowmeters, Pressure, Temperature, Level and smoke detectors.
- Process Control Narrative Development
- PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
- FAT, SAT and training for RPU's and PLC's.
List of Major Suppliers:
- PLC : Rockwell ControlLogix PLC
- SCADA : GE iFIX Professional
- OIT : FactoryTalk View ME
- SCADA Standards: Valley’s own Standards
Background
Construction of a new Sewage Pumping Station (SPS) as part of a new Erin Wastewater Collection System extending from the communities of Hillsburgh and Erin Village.
Project Scope
• New pumps, associated process piping, pipe supports, guide rails, and valves.
• Building mechanical services including heating and ventilation, fire protection, water services
• New 600V 3 Phase service with meter, transformers at SPS and diesel standby generator at William Street site
• Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.
Project Demand
• Effective Project Management & execution.
Reason for Win!!
• A one-stop systems integration solution for a powerful whole.