Town of Erin - Water Resource Recovery Facility

Town of Erin - Water Resource Recovery Facility

Scope of Valley Integration Inc., - Instrumentation + Control Panel + Programming

Valley Integration was responsible for SITC of,

  • New PLC, Mixer, Heat Tracing and Communication Panels
    Process Instruments: DO Analyzer, Gas Detection System, Flowmeters, Pressure, Temperature and Level.
    PLC, HMI & SCADA Programming, Testing, Integration, Commissioning and Documentation.
    FAT, SAT and training for Instrumentations and PLC's.

List of Major Suppliers:

  • PLC : Rockwell PLC
  • SCADA : GE iFIX Professional
  • OIT : FactoryTalk View ME
  • SCADA Standards : Valley’s own standards
  • INSTRUMENTS : By Valley as per approved list.             

 

Background
Construction of new Water Resource Recovery Facility (WRRF). The project involves the construction of the new treatment plant along with outfall and force main between the two.

Project Scope
New pumps, Grit equipment’s. Bar Screens, Aeration grid, Clarifiers.
Plant wide HVAC & Gas detection system
Electrical Scope: MCC's, VFD's, lighting panels and transformer. RPU and communication panels.
Instrumentation: PLC, Control Panel, Process Instruments and SCADA Programming.

Project Demand
Experts from MEP & Instrumentation of WTP being new project.
Effective Project Management & execution.

Reason for Win!!
Listed as an approved System Integrator
Accurate budgeting & Value Engineering

Screenshot_2024-03-09_001220.jpg

Slide 1
Get connected with us now!
Slide 1
Image is not available
A one-stop systems integration solution for a powerful whole.
Social
LinkedIn
Toronto
+1 905 930 1100
info@valley-int.com
12-3170 Ridgeway Dr.
Mississauga,ON
L5L 5R4
Vancouver
+1 604-909-2091
info@valley-int.com
15300 Croydon Dr,
Surrey, BC
V3Z 0Z5
Thunder Bay
+1 905 930 1100
info@valley-int.com
886 Alloy Pl,
Thunder Bay, ON
P7B 6E6